Primary Scalping Screen
The screen was installed to reclaim 30/100 mm product from material scalped prior to the primary Horizontal Shaft Impactor.
Project Highlights:
- Svedala VFS 36/15 double deck primary scalping screen.
- Metso Trellex rubber modular panel system. Installed to handle the sticky nature of the limestone scalping’s.
- In feed bypass chute. Chute allowed customer to bypass screen when scalped material was of poor quality to be processed in the system.
- Screen structure, incorporating roll away discharge chutes.
- 30/100 mm product conveyor and transition chute. Full skirting of conveyor to retain material and conveyor walk way down one side of conveyor and around head drum.
- 0/30 mm product conveyor. Conveyor walk way down one side of conveyor and around head drum.